Kilkerran South DMA Site Investigation

Kilkerran South DMA (Ballylibert & Galley Head) Site Investigation and Rural Mains Rehabilitation

Scope of works:

  • The installation of approximately 1,210m of 90mm O.D. PE watermain to BS EN 12201-2:2011, SDR 17, 10 Bar, associated valves/connections, provision of new individual service connections to properties located along the route of the new mains and all required ancillary works.
  • All works to be in accordance with both the Irish Water – Water Pipeline Specification (Doc. Nr. IW-TEC-1000-01) and the Standard Details (IW STD W01_W33) included as separate documents.
  • Role of PSDP, Designer and PSCS for the works.
  • Full certified testing and commissioning of the new watermain on completion.
  • Construction of new chambers for all associated valves and meters etc.
  • Crossing existing live services, including potential watermains, electricity and telecommunications ducts.
  • The preparation of a fully developed Traffic Management Plan for all stages of the works having regard to the current Guidelines for the Control and Management of Traffic at Road Works (Dept. of Transport/HSA/NRA/LGMSB – Second Edition 2010) and current Chapter 8 of the DEHLG “Traffic Signs Manual”.

Client

Irish Water

Date

October 2016 – December 2016

Contract Value

€ 136 307