The Swiss Cottage Bridge is of national heritage importance and was therefore a sensitive project to work on.
The Contract involved the repair and painting of the Swiss Cottage Bridge. The total span of the bridge is 37.5 m long between buttresses and 3.95 wide between arches. Scope of works included:
Temporary Specialist Scaffolding over River
Removal of the existing composite steel / concrete deck.
Removal of 9no cross tie channels (305 x 89 x 41.69)
Installation of 9no 250 x 250 x 10 SHS and pre-cast slabs covered with an in-situ screed.
Existing bearings underpinned and replaced with 6no elastomeric bearings per end bearing.
Shotblasting the entire bridge
Repainting the entire bridge
Client
Office of Public Works
Client Representives
TOBIN Consulting Engineers
Date
May 2007 – August 2007
Contract Value
€ 240 000