N72 Lacknamona, Ballygriffin and Templenoe Pavement Strengthening Schemes.
The scheme comprised of 3 number circa 2km lengths of online pavement strengthening works on the existing N72 at three separate location sbetwen Mallow and Fermoy.
The scheme involved the following development on the site:
- Pavement strengthening including alterations and localised widening of existing
- Carriageways, access aprons, footpaths, kerbing etc.
- Excavation of the existing road in places.
- Excavation of land adjacent to the existing road for percolation areas.
- Drainage works.
- Diversion and protection of assets of authorities, utilities and service providers.
- Erection of signage and the application of road markings.
- Traffic Management.
- Landscape, environmental and mitigation works.