RC Flood Attenuation Ponds on the Nenagh to Limerick DB Road Project
Client: Bothar Hibernian
Location: N7 HQDC
Date: July 2009- February 2010
Contract Value: € 640,000
Client Representives: Bothar Hibernian & Hyder Consulting Engineers
MEIC Ltd undertook the role of Main Civil Contractor for all works carried out on the Concrete Attenuation Tanks installed on the N7 HQDC. The works consisted of the following items;
- The excavation and construction of 4Nr buried Reinforced Concrete Tanks alongside Irish Rail Tracks.
- Tanks combined capacity of 1400m3.
- Installation of petrol interceptors, handstops, penstocks and attenuation ditches.